Give every important entry point a destination

A website migration changes the way a site is hosted or maintained. People still arrive through bookmarked articles, search results, proposal links, and referrals. A release must account for those entry points as well as navigation from the new homepage. Finding an article and submitting an inquiry are separate journeys, and both need to work before a migration can be called ready.

The Industry Leader migration planning case study provides the project context for this method. The examples here show the proposed controls, validation steps, and release decisions. They make no claim about search performance or conversion lift after cutover.

Build a redirect register from multiple sources

Combine a crawl of the current website, its XML sitemaps, internal links, and any authorized search, analytics, or server-log exports. Check whether campaign links in proposals and email templates resolve to pages absent from the sitemap. For each record, capture the exact old path, response code, canonical URL, new path, intended disposition, and the evidence used to choose the replacement. Preserve the original case and character encoding when testing. Keep a separate field for unresolved paths.

Classify each meaningful URL as retained, moved to a close equivalent, consolidated into a relevant destination, or withdrawn. Where a comparable page exists, route the old URL there directly. Google documents permanent server-side redirects as a signal for a permanent move. When a page has no suitable replacement, give it the appropriate missing or removed response. A blanket homepage redirect obscures missing content and makes it harder for users to discover the right destination. See Google’s site move guidance for the search-specific steps.

Keep navigation, metadata, and redirects in agreement

Test the first response from the old address, the final URL, and the final page content. A successful HTTP response alone cannot catch a mapping that leads to the wrong article. Check canonical tags, internal links, sitemaps, and social preview metadata as a unit. The page’s preferred URL, sitemap listing, and links should point to the intended final address. Confirm that production indexing controls match the launch plan. Preview indexing restrictions should remain in effect on the preview.

Use a small human-reviewed sample drawn from the most visited pages, deep archive links, non-ASCII titles, multi-step purchase or inquiry journeys, missing pages, and links included in active proposals. Run automated response checks across the complete URL list. Review loops and chains, expired certificates, and differences across hostnames. Record the expected page title or a stable content marker so the checker can detect a stale route serving the wrong content.

Test the whole inquiry journey

Start the test on a legacy article or portfolio URL, as a visitor might. Follow the article CTA to the form, submit clearly labeled synthetic details, and verify that the server saved exactly one record. Check that a confirmation appears only after receipt, that the team can find the record in its work queue, and that the expected source information survives. Check retries, validation errors, required fields, and the fallback if the form service is unavailable. Separate test records from operational reporting.

Measure CTA clicks and successful submissions as distinct events. A click indicates interest, while confirmation establishes that the intake accepted the request. Use aggregate data for reporting and exclude inquiry messages and contact details from analytics events. Test on mobile, with a keyboard, and on a slow connection. Include any secondary delivery path in the test, whether a pipeline spreadsheet, a CRM, or a monitored inbox.

Define release gates and a response plan

  1. Approve all priority URL mappings and assign an owner to unresolved exceptions.
  2. Verify the target host, certificates, production metadata, and preserved email-related DNS records.
  3. Run a live-like inquiry test and confirm receipt and team visibility from the same submission.
  4. Record the release timestamp and designate the person who can roll back a routing or application change.
  5. After the switch, repeat representative checks from a signed-out device and document deviations.

Plan for partial recovery. DNS changes can take time to propagate, and returning to an older application or deployment may be faster than reversing every record. Keep the previous route map and test the recovery procedure before the switch. If the form fails while page routing still works, use the predetermined inquiry fallback, verify that its recipient can respond, and document the affected window.

Measure the migration in the weeks that follow

Track response errors, unexpected final destinations, completion of the inquiry journey, and changes in search discovery by page or page group. Compare periods with similar traffic and account for concurrent campaigns, content releases, and holidays. Keep aggregate measures and the exception list together so project owners can distinguish a redirect bug from a reporting delay. Share a dated release record with concrete failures, fixes, and open decisions. The migration planning case study shows the context in which this checklist was developed.